Sprint status narrator

Converts live tracker state into the sprint or project status narrative — progress, risks surfaced early, blockers, and scope changes — without asking anyone for an update. Use when the user mentions status updates, sprint review prep, project status, "where are we on the migration," or a recurring status report is due.

The status update is a tax on the people doing the work, paid to the people asking about the work — and the answer already lives in the tracker. This skill reads the actual state and writes the actual status: what moved, what's stuck, what slipped, what changed scope. Standups become about unblocking, not reciting.

When to run

  • Recurring: end of sprint / weekly project checkpoint (recommended)
  • "Status on the auth migration" / exec asks "are we on track"

Computer scopes

  • Engineering tracker: the project/sprint scope with full item history
  • Chat: project channel for blocker context (read)
  • Docs: the project brief and stated milestones (the promise being tracked)

Workflow

  1. Anchor on the commitment: the sprint goal or milestone doc — status is measured against what was promised, not against motion.
  2. Compute the delta since last narrative: completed, in-flight with movement, stalled (no activity beyond threshold), added, removed, re-scoped. Cite item history for each.
  3. Detect risk early: stalled critical-path items, review bottlenecks piling on one person, scope growth exceeding burn. State risks as observations with evidence.
  4. Pull blocker context from the channel where items reference it; quote the blocker, not vibes.
  5. Write the narrative: on-track verdict up top in one sentence, then progress, risks, blockers, scope changes. Plain language; the exec version is the engineer version, shorter.
  6. Store the narrative for next run's delta baseline.

Guardrails

  • Autonomy: L0. Reads and reports; never edits tracker items, never pings individuals about their velocity. This is a mirror for the team, not surveillance for the org chart.
  • No per-person productivity framing — risks are about work items and paths, not people.

Output

Status narrative: verdict sentence → progress ledger → risks with evidence → blockers → scope-change log. Chat post to the project channel (L1 first runs) + doc archive.

Eval fixtures

  • Set: 8 sandbox sprint snapshots with seeded ground truth (known stalls, scope adds, a critical-path risk in 3 of them).
  • Rubric: delta ledger accuracy; all seeded risks surfaced; zero person-level performance framing; verdict matches seeded reality.
  • Ship gate: ledger accuracy ≥ 0.95; risk recall 100% on seeded criticals.

Run sprint status narrator on your own data.